<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
>

<channel>
	<title>&lt;br&gt;&lt;b&gt;Op&lt;/b&gt;timal &lt;b&gt;En&lt;/b&gt;gineering Design for Dependable Water and Power &lt;b&gt;G&lt;/b&gt;eneration &lt;br&gt; in Remote &lt;b&gt;A&lt;/b&gt;reas Using Renewable Energies and &lt;b&gt;In&lt;/b&gt;telligent Automation</title>
	<link>http://www.open-gain.org/</link>
	<description>OpenGain project offers a solution to cost optimal co-production of energy and water using renewable energy besides diesel generators. Cost optimization is achieved through a high level of automation, which is necessary to adapt the working conditions to the strongly varying renewable energy supply, and remote maintenance. To combat water scarcity and desertification, intensive desalination activities have been carried out in remote arid regions. However, desalting is resources and energy intensive, which are limited and expensive. Thus, water production must be increased while keeping the consumption of resources affordable. For remote arid areas, de-centralised solutions for energy and water co-production offer advantages over large central production sites. Finally, skilled personnel are normally absent in such areas, what demands dependable systems. To implement all this, a highly qualified consortium complemented by experienced subcontracting companies was established.</description>
	<language>en</language>
	<generator>SPIP - www.spip.net</generator>

	<image>
		<title>&lt;br&gt;&lt;b&gt;Op&lt;/b&gt;timal &lt;b&gt;En&lt;/b&gt;gineering Design for Dependable Water and Power &lt;b&gt;G&lt;/b&gt;eneration &lt;br&gt; in Remote &lt;b&gt;A&lt;/b&gt;reas Using Renewable Energies and &lt;b&gt;In&lt;/b&gt;telligent Automation</title>
		<url>http://www.open-gain.org/spip.php/squelettes/IMG/png/local/cache-vignettes/L92xH91/squelettes/styles/IMG/siteon0.png</url>
		<link>http://www.open-gain.org/</link>
		<height>100</height>
		<width>222</width>
	</image>




	<item>
		<title>OPEN-GAIN - 6th project meeting </title>
		<link>http://www.open-gain.org/spip.php?article43</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article43</guid>
		<dc:date>2009-12-29T10:36:15Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique41">The 6th project meeting </category>

		<dc:subject>descriptif</dc:subject>

		<description>OPEN-GAIN - 6th project meeting &lt;br /&gt;The 6th project meeting took place on 9&amp;10th of December 2009 in Beirut, Lebanon. The meeting was attended by: Prof. Essam Badreddin (Chair, Project Coordinator), Dr. Amr Kandil (UHEI), Dr. Mohammedi Kamel, Mr Sadi Abdelkrim, (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Mrs Johanna Salazar (UVA), Prof. Amenallah Guizani, Dr Hamza Elfil (CRTEn). Participants presented and discussed the project work progress and results achieved up to 3rd project period. The goal of (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique41" rel="directory"&gt;The 6th project meeting &lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;OPEN-GAIN - 6th project meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The 6th project meeting took place on 9&amp;10th of December 2009 in Beirut, Lebanon. The meeting was attended by: Prof. Essam Badreddin (Chair, Project Coordinator), Dr. Amr Kandil (UHEI), Dr. Mohammedi Kamel, Mr Sadi Abdelkrim, (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Mrs Johanna Salazar (UVA), Prof. Amenallah Guizani, Dr Hamza Elfil (CRTEn). Participants presented and discussed the project work progress and results achieved up to 3rd project period. The goal of this meeting was to prove exactly what has been done until now in the project and the plan for the last project year.
UHEI presented the project goal and the new work plan and the new list of deliverables after the extension of the project were discussed.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_73 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L283xH213/6th-4252c.jpg' width='283' height='213' style='height:213px;width:283px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>OPEN-GAIN 5th project meeting </title>
		<link>http://www.open-gain.org/spip.php?article42</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article42</guid>
		<dc:date>2009-12-06T09:44:06Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique40">The 5th project meeting</category>

		<dc:subject>descriptif</dc:subject>

		<description>OPEN-GAIN 5th project meeting &lt;br /&gt;The 5th project meeting took place on 25th et 26th of June 2009 in Hammamet, Tunisia. The meeting was attended by: Prof. Essam Badreddin (Project Coordinator), Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo, Mr Luis Palacin (UVA), Prof. Sassi Ben-Nasrallah, Prof. Amenallah Guizani, Dr Hamza Elfil, Dr Ridha Andoulsi, Khenissi Lotfi (CRTEn). Participant presented (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique40" rel="directory"&gt;The 5th project meeting&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;OPEN-GAIN 5th project meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The 5th project meeting took place on 25th et 26th of June 2009 in Hammamet, Tunisia. The meeting was attended by: Prof. Essam Badreddin (Project Coordinator), Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo, Mr Luis Palacin (UVA), Prof. Sassi Ben-Nasrallah, Prof. Amenallah Guizani, Dr Hamza Elfil, Dr Ridha Andoulsi, Khenissi Lotfi (CRTEn). Participant presented and discussed the project work progress and results achieved up to the first half of the 3rd project period&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_72 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L321xH225/5th-c142c.jpg' width='321' height='225' style='height:225px;width:321px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>The 4th project meeting</title>
		<link>http://www.open-gain.org/spip.php?article41</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article41</guid>
		<dc:date>2009-01-24T08:30:17Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique39">The 4th project meeting</category>

		<dc:subject>descriptif</dc:subject>

		<description>The 4th project meeting &lt;br /&gt;The 4th project meeting took place on 16-18th of December 2008 in Tunis, Tunisia. The meeting was attended by: Project Officer Mario Scalet (European Commission), Prof. Essam Badreddin, Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki, Karim Kabalan (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo, Mr Luis Palacin (UVA), Prof. Sassi Ben-Nasrallah, Prof. Amenallah Guizani, Dr Hamza Elfil, Dr Ridha Andoulsi, Mrs Kamila (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique39" rel="directory"&gt;The 4th project meeting&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;The 4th project meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The 4th project meeting took place on 16-18th of December 2008 in Tunis, Tunisia. The meeting was attended by: Project Officer Mario Scalet (European Commission), Prof. Essam Badreddin, Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki, Karim Kabalan (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo, Mr Luis Palacin (UVA), Prof. Sassi Ben-Nasrallah, Prof. Amenallah Guizani, Dr Hamza Elfil, Dr Ridha Andoulsi, Mrs Kamila Ben-Youssef (CRTEn). Participant presented the work achieved during the second period of the project with emphasis on equipments acquisition and housing construction for the prototype.
A field visit was organized to the construction site where the project members and project officer had the opportunity to assist to the reverse osmosis running test.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_68 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L360xH270/4th11-73305.jpg' width='360' height='270' style='height:270px;width:360px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_67 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L360xH270/4th22-949e7.jpg' width='360' height='270' style='height:270px;width:360px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>Newsletter</title>
		<link>http://www.open-gain.org/spip.php?article40</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article40</guid>
		<dc:date>2008-11-19T09:01:44Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique38">Newsletter</category>

		<dc:subject>descriptif</dc:subject>

		<description>Open-gain Newsletters &lt;br /&gt;Newsletter'1 Covering project 1st year period (2007)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique38" rel="directory"&gt;Newsletter&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt; &lt;i class=&quot;spip&quot;&gt;Open-gain Newsletters&lt;/i&gt; &lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;img src=&quot;http://www.open-gain.org/local/cache-vignettes/L8xH11/puce-68c92.gif&quot; width='8' height='11' alt=&quot;-&quot; style='height:11px;width:8px;' class='' /&gt; &lt;strong class=&quot;spip&quot;&gt;Newsletter'1 Covering project 1st year period (2007)&lt;/strong&gt;&lt;/p&gt;
&lt;div class='spip_document_65 spip_documents_left' style='float:left;'&gt; &lt;div class='spip_documents' style='width:120px;'&gt; &lt;div&gt;&lt;a href=&quot;http://www.open-gain.org/IMG/pdf/Newsleter1.pdf&quot; type=&quot;application/pdf&quot; title='PDF - 1.8 Mb'&gt;&lt;img src='http://www.open-gain.org/local/cache-vignettes/L52xH52/pdf-d7486.png' width='52' height='52' alt='PDF - 1.8 Mb' style='height:52px;width:52px;' class=' format_png' /&gt;&lt;/a&gt;&lt;/div&gt; &lt;/div&gt;
&lt;/div&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>First mid-year 2008 meeting</title>
		<link>http://www.open-gain.org/spip.php?article39</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article39</guid>
		<dc:date>2008-10-29T08:34:32Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique37">First mid-year 2008 meeting</category>

		<dc:subject>descriptif</dc:subject>

		<description>First mid-year 2008 meeting &lt;br /&gt;The project 1st semestral meeting of year 2008 took place on 23-24th of June in the historical city of Athens &#8211; Greece. The meeting was attended by: Prof. Essam Badreddin, Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo (UVA), * Unfortunately Dr Imed Chouch, Ms Kamilia Ben-Youssef (CRTEn) did not manage to attend the meeting due to organizational problem At this (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique37" rel="directory"&gt;First mid-year 2008 meeting&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;First mid-year 2008 meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The project 1st semestral meeting of year 2008 took place on 23-24th of June in the historical city of Athens &#8211; Greece. The meeting was attended by: Prof. Essam Badreddin, Dr. Amr Kandil (UHEI), Prof. Sadi Abdelkrim, Dr. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo (UVA), * Unfortunately Dr Imed Chouch, Ms Kamilia Ben-Youssef (CRTEn) did not manage to attend the meeting due to organizational problem
At this stage of the project, the partners discussed relevant issues as:&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;- Design and the specification of the power systems, subsystems and equipments.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;- Assessment of the work progress.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;- Equipments acquisition and transportation .&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;- Actions to undertake with regards to project on-going.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_62 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L400xH315/DSCN1851_copie1-5da6f.jpg' width='400' height='315' style='height:315px;width:400px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;NERC, AUB and UHEI took part in sub-commission meeting. The discussions were mainly about the size of the different system components according to the typical user's profile (electricity and water in Tunisia) and within the available funds.&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>The First Annual Meeting</title>
		<link>http://www.open-gain.org/spip.php?article38</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article38</guid>
		<dc:date>2008-02-12T13:55:14Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique36">The First Annual Meeting</category>

		<dc:subject>descriptif</dc:subject>

		<description>OPEN-GAIN 1st annual meeting &lt;br /&gt;The project 1st annual meeting took place on 5-7, December 2007 in the beautiful city of Hammamet &#8211; Tunisia. The meeting was attended by: Prof. Essam Badreddin, Dr. Amr Kandil, Mr. Michael Kr&#246;ger (UHEI), Prof. Sadi Abdelkrim, Prof. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo (UVA), Prof. Sassi Ben Nasrallah, Dr. Imed Chouch (CRTEn.), Mr. David Torrijos, Mr. Juan Robles, Mr. Javier Lucia (SETA) Nearly one year (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique36" rel="directory"&gt;The First Annual Meeting&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;OPEN-GAIN 1st annual meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The project 1st annual meeting took place on 5-7, December 2007 in the beautiful city of Hammamet &#8211; Tunisia. The meeting was attended by: Prof. Essam Badreddin, Dr. Amr Kandil, Mr. Michael Kr&#246;ger (UHEI), Prof. Sadi Abdelkrim, Prof. Mohammedi Kamel (CDER), Prof. Sami Karaki (AUB), Mr. Firas Alawneh (NERC), Prof. Dionysis Assimacopoulos, Mr. Makis Kartalides, Dr. George Arampatzis (NTUA), Prof. Cesar Prada, Dr. Fernando Tadeo (UVA), Prof. Sassi Ben Nasrallah, Dr. Imed Chouch (CRTEn.), Mr. David Torrijos, Mr. Juan Robles, Mr. Javier Lucia (SETA)
Nearly one year after the project start-up, this was a good opportunity to assess the work performed during the first period.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_58 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L400xH315/meeting2-2-eb133.jpg' width='400' height='315' style='height:315px;width:400px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The main goals of the meeting are:&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;1) to assess work performed during the first period&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;2) to discuss relevant issues with regard to the project on-going&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;3) to discuss with SETA the issues relative to the RO unit&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;A visit was organised by CRTEn.to the site where the project prototype will be built&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;Fruitful discussions arose through the presentations and appropriate advices issued for up-coming actions.&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>Kick-Off Meeting</title>
		<link>http://www.open-gain.org/spip.php?article36</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article36</guid>
		<dc:date>2008-02-12T13:20:10Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique35">Kick-Off Meeting</category>

		<dc:subject>descriptif</dc:subject>

		<description>OPEN-GAIN Kick-Off Meeting &lt;br /&gt;The meeting took place in Hurgada Egypt during the period April 18-20, 2007. The meeting was attended by Prof. Badreddin (UHEI) -Coordinator- , Martin Wolf (UHEI), Prof. Assimacopoulos (NTUA), Dimitris Galanis (NTUA), Prof. de Prada Moraga (ISA), Luis Gomez Palacin (ISA), Imed Chaouch (C.R.T.En.) Firas Alawneh (NERC), Prof. Sadi (CDER). Prof. Chedid (AUB) was unable to attend the whole meeting due to the cancellation of his flight. &lt;br /&gt;The main goals of the meeting are: &lt;br /&gt;1) to discuss and clarify on the technical issues necessary to start the project &lt;br /&gt;2) discuss and (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique35" rel="directory"&gt;Kick-Off Meeting&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;strong class=&quot;spip&quot;&gt;OPEN-GAIN Kick-Off Meeting&lt;/strong&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The meeting took place in Hurgada Egypt during the period April 18-20, 2007. The meeting was attended by Prof. Badreddin (UHEI) -Coordinator- , Martin Wolf (UHEI), Prof. Assimacopoulos (NTUA), Dimitris Galanis (NTUA), Prof. de Prada Moraga (ISA), Luis Gomez Palacin (ISA), Imed Chaouch (C.R.T.En.) Firas Alawneh (NERC), Prof. Sadi (CDER). Prof. Chedid (AUB) was unable to attend the whole meeting due to the cancellation of his flight.&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;&lt;span class='spip_document_53 spip_documents spip_documents_center' &gt; &lt;img src='http://www.open-gain.org/local/cache-vignettes/L358xH269/Low_Res_Kick-2-a686f.jpg' width='358' height='269' style='height:269px;width:358px;' class='' /&gt;
&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;The main goals of the meeting are:&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;1) to discuss and clarify on the technical issues necessary to start the project&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;2) discuss and agree on the administrative issues especially with regard to the finances&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;3) discuss the site for the prototype since (C.R.T.En.) has problems of administrative nature which can lead to difficulties building the prototype there&lt;/p&gt; &lt;p class=&quot;spip&quot;&gt;4) presentation and socialization of the partners&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>Workpackage8</title>
		<link>http://www.open-gain.org/spip.php?article35</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article35</guid>
		<dc:date>2008-01-27T09:48:11Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique33">Workpackage 8</category>

		<dc:subject>descriptif</dc:subject>

		<description>WP-8: Dissemination of Scientific Work &lt;br /&gt;Workpackage number: WP-8 Start date or starting event: 0 &lt;br /&gt;Participants: DZ LB TN JO Total PM Person-months per participant: 15 8 6 4 33 &lt;br /&gt;Objectives &lt;br /&gt;O-8.1: To increase awareness and education level on problems and opportunities in the field of desalination using renewable energies &lt;br /&gt;O-8.2: To reinforce the building of capacities to promote new results and the importance of automated systems in general &lt;br /&gt;O-8.3: To disseminate information in the shape of local and public authorities by supporting and promoting de-centralized water and power production (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique33" rel="directory"&gt;Workpackage 8&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;span style=&quot;font-size: 13.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;WP-8: Dissemination
of Scientific Work&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Workpackage number: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;WP-8 &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Start
date or starting event: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;0&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Participants: DZ &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;LB TN JO &lt;/span&gt;&lt;span style=&quot;font-size: 9.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;Total PM &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Person-months
per participant: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;15 8 6 4 33&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Objectives&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-8.1: To increase awareness
and education level on problems and opportunities in the field of desalination
using renewable energies&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-8.2: To reinforce the
building of capacities to promote new results and the importance of automated systems
in general&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-8.3: To disseminate
information in the shape of local and public authorities by supporting and promoting
de-centralized water and power production for remote areas&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-8.4: To disseminate the
know-how acquired through the project within all MENA countries, which will be
actively identified to facing de-central water and power supply difficulties&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Description of work&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.1: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Resources
and conditions assessment &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ, LB, TN, JO): To develop the data basis for the decision
support system, which has to take into account country boundary conditions for
the design, national information sources on water, wind, and solar conditions
as well as socio-economic, administrative and political boundary conditions for
every participating MPC will be reviewed. This data will also later be used to
support dissemination.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.2: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Potentials
assessment &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ, LB, TN, JO): National information on technical knowledge, manufacturing
capacities/capabilities and conditions for public-private partnerships for each
participating MPC will be reviewed. Studies on socio-economic and political
impact of the dissemination of the results, regarding quality of life, gender,
migration, employment and regional conflicts, will be undertaken and reported
to the commission.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.3: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Results
dissemination &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ, LB, TN, JO): Results will be disseminated by the water
authorities within their countries. Besides further submitting publications
with the latest results to all relevant conferences, the leader of WP-8 will
organize exhibitions and an international workshop.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.4: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Access
policy to the facilities &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ, LB, TN, JO): A policy for the future
accessibility to the facilities for research will be established. Hereby it
will be kept in mind that the laboratory itself shall, under conditions
pre-established from the EU, become accessible to every institution interested
in the knowledge and tools developed by the project and/or in additional
research, including experimenting with the plant itself.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.5: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Dissemination
MENA wide, advisory and services &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ, LB, TN, JO): Results of the project will
be distributed into MENA countries by using the networking capacities of MEDRC.
Studies on socio-economic and political impact of the project obtained from
T-8.2 regarding quality of life, gender, migration, employment, regional
conflicts will be transmitted. Moreover, R&amp;TD consultancy and engineering
services will be offered to water and power authorities, companies and research
institutions.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Deliverables&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-8.1: Individual MPC
reports on &#8220;Resources and Boundary Conditions for the proposed plant&#8221;&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-8.2: Reports on potentials
for local manufacturing of components and systems in each MPC&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-8.3: Report on
&#8220;Dissemination of project results into MENA countries&#8221;&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Milestones and
expected result&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-8.1: Organization of an
on-site workshop to disseminate and exemplify results&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-8.2: Proposal from MPC to
develop co-operative research by using the prototype in the future&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-8.3: Interest and decision
of MENA countries to introduce high technological desalination in their arid
remote areas&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;Tasks
&lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.4
&lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;and &lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-8.5 &lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;from &lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;TN &lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;shall be
performed by the subcontractor &lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;CO3 &lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;from Tunisia.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>Workpackage7</title>
		<link>http://www.open-gain.org/spip.php?article34</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article34</guid>
		<dc:date>2008-01-27T09:47:03Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique32">Workpackage 7</category>

		<dc:subject>descriptif</dc:subject>

		<description>WP-7: Integrated Implementation and Control System Design of a Prototype &lt;br /&gt;Workpackage number: WP-7 Start date or starting event: 21 &lt;br /&gt;Participants: TN DE ES JO DZ Total PM Person-months per participant: 13 10 9 4 2 38 &lt;br /&gt;Objectives &lt;br /&gt;O-7.1: To specify the hardware and software for the real-time operation &lt;br /&gt;O


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique32" rel="directory"&gt;Workpackage 7&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;span style=&quot;font-size: 13.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;WP-7: Integrated
Implementation and Control System Design of a Prototype&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Workpackage number: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;WP-7 &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Start
date or starting event: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;21&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot;&gt;Participants: TN &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot;&gt;DE ES JO DZ &lt;/span&gt;&lt;span style=&quot;font-size: 9.5pt; font-family: TimesNewRoman;&quot;&gt;Total PM &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot;&gt;Person-months per
participant: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot;&gt;13
10 9 4 2 38&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot;&gt;Objectives&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-7.1: To specify the
hardware and software for the real-time operation&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-7.2: To integrate the RO
plant, the power supply subsystem and the control system to obtain the whole
prototype&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-7.3: To start up the whole
plant and to carry out intensive operative tests, data logging and model validation&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Description of work&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.1: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Transfer
of component&lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;s: (TN&lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;): &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;All tested components should
be transported to the place, where the prototype will be assembled. The
corresponding groups will be responsible for the delivery of the components and
TN for the reception and care at installation site. Laboratory infrastructure
has to be created before this deadline.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.2: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Prototype
integration &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(TN): The whole plant will be built in the laboratory. Later,
when the containerised prototype is working properly at laboratory conditions,
it should be moved to the exterior to start field-testing outdoors. The energy
supply subsystem including all components (photovoltaic panels, wind turbine,
diesel generator, batteries and energy management), the RO plant and the
instrumentation will be joined to create a small-scaled plant, which will
produce drinking water and electrical power based on renewable energies.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.3: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Start-up
and field-testing of the whole plant &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(TN, JO, DZ,): The plant
will be started up progressively subsystem by subsystem. An iterative procedure
to solve malfunctions will be applied. First operational tests will be performed:
Check of operability of all subsystems, check of proper functioning of sensors,
energy consumption, etc. Chemicals for pre-treatment and post-treatment have to
be chosen and prepared.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.4: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Implementation
of the real-time control system &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DE, ES): Specifications for the real-time hardware
and software shall be performed. The definition of interfaces for the real-time
software development as well as the implementation and optimisation of
algorithms for real-time operation (start up, shut down, control, change of
operation points, etc.) will constitute the most activities of this task.
Monitoring and fault-detection tasks require appropriate modelling of the plant
behaviour and prediction methods also including weather-forecast data.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.5: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Test of
the real-time system &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(TN, DE, ES&lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;): &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;The real-time
system has intensively to be tested to detect inconsistencies and programming
errors.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Deliverables&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-7.1: Optimal prototype for
RO desalination with renewable energies&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-7.2: Real-time system for
fault-tolerant control, supervision and remote monitoring&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-7.3: Report and handbook
on the real-time control system&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Milestones and
expected result&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-7.1: Start integration
after all parts were delivered&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-7.2: Start-up and field
testing completed&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-7.3: Start control system
implementation after the plant is operative&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-7.1: Successful prototype
start-up and testing&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-7.2: Successful control
and supervision system&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.5
&lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;and
partially the task &lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-7.3 &lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;shall be carried out by the subcontracted company &lt;/span&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;CO&lt;/span&gt;&lt;span style=&quot;font-size: 10.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;2.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>



	<item>
		<title>Workpackage6</title>
		<link>http://www.open-gain.org/spip.php?article33</link>
		<guid isPermaLink="true">http://www.open-gain.org/spip.php?article33</guid>
		<dc:date>2008-01-27T09:45:22Z</dc:date>
		<dc:format>text/html</dc:format>
		<dc:language>en</dc:language>
		<dc:creator>admin</dc:creator>

<category domain="http://www.open-gain.org/spip.php?rubrique31">Workpackage 6</category>

		<dc:subject>descriptif</dc:subject>

		<description>WP-6: Power Supply Subsystem &lt;br /&gt;Workpackage number: WP-6 Start date or starting event: 10 &lt;br /&gt;Participants: JO DZ TN Total PM Person-months per participant: 13 11 9 33 &lt;br /&gt;Objectives &lt;br /&gt;O-6.1: To obtain an up-to-date catalogue of components for renewable energy supply &lt;br /&gt;O-6.2: To build prototypes for the each energy supply according to the results given in WP-3 (PV, wind, diesel and batteries) &lt;br /&gt;O-6.3: To construct the energy manager &lt;br /&gt;O-6.4: To integrate the prototypes in order to obtain the power supply subsystem &lt;br /&gt;O-6.5: To start up the power supply subsystem and to carry out operational tests (...)


-
&lt;a href="http://www.open-gain.org/spip.php?rubrique31" rel="directory"&gt;Workpackage 6&lt;/a&gt;

/ 
&lt;a href="http://www.open-gain.org/spip.php?mot2" rel="tag"&gt;descriptif&lt;/a&gt;

		</description>


 <content:encoded>&lt;div class='rss_texte'&gt;&lt;p class=&quot;spip&quot;&gt;&lt;span style=&quot;font-size: 13.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;WP-6: Power Supply
Subsystem&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Workpackage number: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;WP-6 &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Start
date or starting event: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;10&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Participants: JO &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;DZ TN &lt;/span&gt;&lt;span style=&quot;font-size: 9.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;Total PM &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Person-months
per participant: &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;13 11 9 33&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Objectives&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-6.1: To obtain an
up-to-date catalogue of components for renewable energy supply&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-6.2: To build prototypes
for the each energy supply according to the results given in WP-3 (PV, wind,
diesel and batteries)&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-6.3: To construct the
energy manager&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-6.4: To integrate the
prototypes in order to obtain the power supply subsystem&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;O-6.5: To start up the power
supply subsystem and to carry out operational tests&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Description of work&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-6.1: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Market
analysis &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(JO,
DZ): Based on the component list supplied by WP-3, a market analysis will be
carried out in order to select the components for the power subsystem. The
results will be introduced in the database.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-6.2: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Construct/Order
components &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(JO, DZ): According to the market analysis carried out in the previous
task and the field conditions, the necessary components to build the prototype
will be constructed and/or ordered from the corresponding providers. Moreover,
the structure to support the components (including place for the RO-plant) will
be designed and constructed.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-6.3: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Prototype
building &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(JO, DZ, TN): Following the plans from WP-3 and using the components constructed
or ordered in the previous task, prototypes for each part of the power supply subsystem
will be built. Moreover, the corresponding infrastructure for the
instrumentation including the field bus shall be designed.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;T-6.4: &lt;/span&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Operation
and laboratory testing of prototypes &lt;/span&gt;&lt;/b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;(DZ): the constructed power
supply subsystem will be started-up and a battery of operational tests will be
carried out on it. Changing loads will be emulated in order to analyse the
response and the behaviour of the prototype.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;Robustness and fault
tolerance will be also tested. Data logging for model validation purposes has
also to be performed.&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Deliverables&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-6.1: Report about the
market analysis for the components and data for the databases&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-6.2: Prototypes for the
power supply subsystem&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-6.3: Report about the
characteristics of prototypes and the plans&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;D-6.4: Handbook for the
operation of the system and information to connect it with RO plant&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;b&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: &quot;TimesNewRoman,Bold&quot;;&quot; lang=&quot;EN-GB&quot;&gt;Milestones and
expected result&lt;/span&gt;&lt;/b&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-6.1: Selection of
components after market analysis according to the plans of WP-3&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-6.2: Construction of
prototype system completed&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;M-6.3: Start-up and
laboratory testing completed. Start point for model validation&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-6.1: Successful prototype
design and construction&lt;/span&gt;&lt;/p&gt; &lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size: 11.5pt; font-family: TimesNewRoman;&quot; lang=&quot;EN-GB&quot;&gt;R-6.2:
Successful testing and prototype delivery&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;
		
		</content:encoded>


		

	</item>





</channel>

</rss>
